Case Study 2
22-08-2013
Accumulation of sheets allows continuous production whilst coil changes are made, this unit has a 180 metres capability or in real terms 15 minutes on a line running at 12 metres/minute, allowing sufficient time to change coils without the production line stopping.Visit the Bumby Design Co Ltd website for more information on Case Study 2